• -September 3rd, 2024-

    Kenfig industrial estate Project Info The works consisted of the deconstruction of NHS buildings; Blocks 33 and 34 at Leigh Infirmary, including asbestos removal. Any cellars were filled with suitable site won materials. All materials arising

  • -September 3rd, 2024-

    Kenfig industrial estate Project Info The works consisted of the deconstruction of the former James Street Club including removal of slab and foundations. Any basement areas to be broken out and backfilled with 6F2. All materials

  • -September 3rd, 2024-

    Kenfig industrial estate Project Info The works consisted of asbestos removal and the full deconstruction of the Sonoco industrial buildings down to slab level for redevelopment by Manchester City Council. Client: Sonoco Consumer Products Category:

  • -September 3rd, 2024-

    Kenfig industrial estate Project Info The works consisted of thenon-structural soft strip of Levels 5 through to 21 at Liberty Bridge to enable redevelopment works for student accommodation. The programme required Booth Hill to liaise with other

  • -September 3rd, 2024-

    Kenfig industrial estate Project Info Category: Building Location: Glaisnock Shopping Centre Townhead Street, Cumnock, Aryshire, KA18 1LE Year completed: 2017 DESCRIPTION The works consisted of deconstruction

  • -September 3rd, 2024-

    Kenfig industrial estate Project Info The annexe building was located on a corner of 2 busy streets in a residential area, therefore extra care was taken to protect the public and passing vehicles at all

  • -September 3rd, 2024-

    Kenfig industrial estate Project Info The works consisted of the full demolition of the redundant Princess works factory buildings to enable the redevelopment of Scotland Street, Sheffield. Category: Building Location: Sheffield Year completed: 2015

  • -September 3rd, 2024-

    Kenfig industrial estate Project Info The works consist of complete demolition, including asbestos removal, of the existing steel framed building including ground floor slab and foundations. All suitable materials to be crushed on site to

  • -September 3rd, 2024-

    Kenfig industrial estate Project Info The work consisted of the demolition of the entire former St Augustine’s School for later re-development by others. The school was based directly in the centre of a highly populated

  • -September 3rd, 2024-

    Kenfig industrial estate Project Info Stanley Court, located at 19-23 Stanley Street, were former offices situation over 5 floors, to be refurbished into student accommodation. The works commenced in November 2015 and were completed in December