Liberty Bridge

Project Info

The works consisted of thenon-structural soft strip of Levels 5 through to 21 at Liberty Bridge to enable redevelopment works for student accommodation. The programme required Booth Hill to liaise with other contractors on site, and work on a 1 week out of each month basis, over a period of 10 months to accommodate all site works. The works commenced in December 2016and are due for completion in September 2017.

Category: Building
Location: Liberty Bridge, Pellet Street, Cardiff, CF10 4FD
Year completed: 2017

DESCRIPTION

The works consisted of thenon-structural soft strip of Levels 5 through to 21 at Liberty Bridge to enable redevelopment works for student accommodation. The programme required Booth Hill to liaise with other contractors on site, and work on a 1 week out of each month basis, over a period of 10 months to accommodate all site works.

The works commenced in December 2016 and are due for completion in September 2017.

Get A Quote Today

Get in touch with us today for a quote on your latest project.  Our team will get back to you as soon as possible.